TECHNOLOGY

Understanding building condition through calculations that show their basis

4 foundational papers

OPEN TECHNOLOGY

Open technology disclosure and our approach to patents

Guided by an open-source mindset, DiO Inc. never hesitates to share ideas and technologies that benefit society. That is why we publish all four foundational papers on our Technology page—complete with creation and revision dates—for free PDF download. Likewise, our patent filings exist solely to prevent exclusive pre-emption by third parties that would block open deployment; our patents are filed because we reject closed business models and wish to protect an open ecosystem.

First edition: November 10, 2026 / Ver. 2.1 finalized: November 12, 2026 / Latest revision (Ver. 2.2, Block Puzzle & machine XYZ carry-in/out integrated edition): November 16, 2026

[Copyright Ownership & Open Technology Publication]

The copyrights to all four foundational papers and the integrated mathematical models published on this page belong personally to the author (Ippitsu). They are openly published with full creation and revision histories for free PDF download as a foundation to support open technological deployment across society.

© 2026 Ippitsu. All foundational papers (Papers 1–4) are personally copyrighted by the author. (Created: Nov 10, 2026 | Ver. 2.1: Nov 12, 2026 | Latest Revision Ver. 2.2: Nov 16, 2026)

※ Academic supervision and recommendation by Prof. Jun Kanda, Professor Emeritus, The University of Tokyo, apply to the 1st Paper only. Figures and checks are reference guidelines and do not judge legal conformity or the pass/fail of inspections.

ICHIGENCHO

Buildings come back to life — even without drawings

Using GSI × PLATEAU × spatial-reasoning AI, we estimate 3D models and floor plans from an address, build up evidence over five steps, and confirm drawings with a matching accuracy of over 95%.

Matching accuracy 95.1% (N=25,908)KIKIKURU linkMaster ID / Sub ID
See the SaaS Business (Ichigen-Cho)
Screen showing a building in 3D using the PLATEAU 3D city model

Source: MLIT 3D city models (Project PLATEAU) and GSI tiles (Geospatial Information Authority of Japan), processed by DiO

ACADEMIC FOUNDATION

Academic foundation: four foundational papers and a 6-item automatic check based on building and fire regulations

Drawings for buildings without drawings are raised by back-calculating from public data, on-site photos and walking records, based on the ideas in the following four papers. The resulting drawings are verified by a 6-item automatic check based on building and fire regulations (drawing consistency check).

Yoshimi Ippitsu

First Paper (founding commemorative paper)

Area conservation law and Z-axis topological invariance

First edition: November 10, 2026 / Ver. 2.1 finalized: November 12, 2026 / Latest revision (Ver. 2.2, Block Puzzle & machine XYZ carry-in/out integrated edition): November 16, 2026

Arentable = Atotal − Aslab − core & corridor area

From the outline area, we subtract the setback deduction Aslab as well as stairs, elevators, toilet pipe shafts and shared corridors to find the usable floor area. We also back-calculate the vertical core position so that it satisfies the core-penetration condition — the core runs through the same position from 1F to the top floor.

[First Paper: academic supervision and recommendation] Prof. Jun Kanda, Professor Emeritus, The University of Tokyo

(Academic supervision of the First Paper: spatial structure inference based on the slab area conservation law and Z-axis topological invariance)

Official title of the First Paper: Automatic inference of three-dimensional spatial structure in multi-story buildings using the slab area conservation law and Z-axis topological invariance

Read the recommendation (reference translation)

In many existing buildings in Japan, drawings from the time of completion have not been kept, and records of daily inspections and repairs remain scattered without being tied to the building structure. To keep using buildings safely for a long time as social assets, it is essential first to correctly grasp a building's structural space and then to build up its maintenance history and preparedness for natural-disaster risks on that basis. The approach adopted by this system — based on the new idea of deriving spatial divisions by "subtracting" vertical structural cores, equipment shafts and regulatory standards from the outer shape in a 3D city model — is consistent with the principles of building engineering and sufficiently practical. I hope that Ichigen-Cho will enable reliable maintenance of existing buildings across Japan and become a foundation for the inspection, repair and preservation of building assets. (Reference translation; the Japanese original prevails.)

Senior advisor, DiO Inc. / Professor Emeritus, The University of Tokyo, PhD — Jun Kanda

* The academic supervision and recommendation apply to the First Paper only (not to the Second to Fourth Papers).

Yoshimi Ippitsu

Second Paper (second report)

Marker-free opposed two-viewpoint perspective projection and projective distortion correction

First edition: November 10, 2026 / Ver. 2.1 finalized: November 12, 2026 / Latest revision (Ver. 2.2, Block Puzzle & machine XYZ carry-in/out integrated edition): November 16, 2026

Opposed two-viewpoint perspective projection + constraint on corridor length Lc from the outline length → corridor width Wc, ceiling height Hc

Actual dimensions are back-calculated from photos taken facing each other from both ends of a shared corridor with a smartphone on site, and from photos of paper as-built drawings. Keystone distortion in the drawings is corrected automatically from four corresponding points to give a straight-on view.

Yoshimi Ippitsu

Third Paper (third report)

Closed-loop spatial identification theory through topological coupling of multi-source public spatial data and feedback from on-site walking verification

First edition: November 10, 2026 / Ver. 2.1 finalized: November 12, 2026 / Latest revision (Ver. 2.2, Block Puzzle & machine XYZ carry-in/out integrated edition): November 16, 2026

GSI 2D map + building outlines from map data + PLATEAU 3D + on-site GPS walking track

We combine the GSI 2D map, building outlines from map data, the PLATEAU 3D city model and the GPS track walked on site to identify the front road (using only roads within ±60° of the outward direction of the front edge). Results confirmed on site are fed straight back into the reliability of the drawings.

Block Puzzle formula: area-conservation normalization + weighted Voronoi partitioning + move-in/move-out clearance check by 3D Minkowski difference

By combining the footprint and regulatory data from the outside with smartphone walking tracks from the inside that cover only the common areas (never entering private spaces) through the Block Puzzle formula over private-area, common-area and machine/equipment blocks (XYZ dimensions)—area-conservation normalization + weighted Voronoi partitioning + move-in/move-out clearance check by 3D Minkowski difference—we obtain in one pass: ① a floor plan with an area residual of 0.00 m², ② the boundaries between rooms and corridors, ③ equipment pin coordinates, and ④ whether machines can be moved in and out along a route in factories and similar facilities.

  • ① Floor plan with an area residual of 0.00 m²
  • ② Boundaries between rooms and corridors
  • ③ Equipment pin coordinates
  • ④ Whether machines can be moved in/out along a route in factories, etc.

In factories and other production facilities, the Block Puzzle also offers "machine / equipment blocks", each holding its X · Y · Z (width · depth · height) dimensions. By mathematically matching the corridor widths, corners, and door, ceiling and beam heights obtained in the 2nd and 3rd papers against the XYZ dimensions of machine blocks, the same data directly supports advance verification of moving machines in and out (whether they pass without hitting corridors, ceilings or beams, and whether they can turn).

Yoshimi Ippitsu

Fourth Paper (fourth report, November 14, 2026)

Building a progressively upgraded database for 1,892 municipalities nationwide: 2D completion of areas without 3D city models and two-level hash-block differential analysis

First edition: November 10, 2026 / Ver. 2.1 finalized: November 12, 2026 / Latest revision (Ver. 2.2, Block Puzzle & machine XYZ carry-in/out integrated edition): November 16, 2026

Single schema bldg-db/1 + two-level Merkle hash (municipal fingerprint Rc × block hash Hc,k) + 2D completion → non-stop upgrade to measured 3D

The 6,772,689 buildings in 1,892 municipalities across all 47 prefectures (95 municipalities / 1,282,287 buildings with PLATEAU 3D; 1,797 municipalities / 5,490,402 buildings with 2D completion) are unified in a single format (bldg-db/1) and split into blocks of up to 2,000 buildings (4,581 blocks, 6,474 files, about 305 MB compressed). Two levels of hashes — by municipality and by block — find and redistribute only changed blocks, so even when a municipality switches to PLATEAU 3D, an update takes only a few files. When a building moves from 2D completion to measured 3D, records such as rooms, inspections and photo pins are carried over unchanged.

6-item automatic check based on building and fire regulations (drawing consistency check)

  • Check ①Floor area consistency for each floor
  • Check ②Vertical continuity of stair and elevator positions between floors
  • Check ③Reference check of evacuation routes (two-direction evacuation, walking distance)
  • Check ④Daylighting and opening balance
  • Check ⑤Consistency of ceiling and story heights with the measured building height
  • Check ⑥Connection between the front road and the 1F entrance

Drawings are finally confirmed when all six checks are met. Results are reference guidelines based on regulations and do not replace the judgment of the authorities.

Reference guidelines based on the e-Gov regulation table

EquipmentLegal basis / articlePlacement guidelinee-Gov law ID
Indoor fire hydrantFire Service Act Enforcement Order, Art. 11On each floor, a horizontal distance of 25 m or less from every part of the floor to a hose connection (e.g. Class 1 hydrants). Near shared corridors and stairs.336CO0000000037
Exit signsFire Service Act Enforcement Order, Art. 26Exit-door and passage guide lights. At evacuation stairs, the 1F front entrance and corridor corners.336CO0000000037
Emergency lightingBuilding Standards Act Enforcement Order, Art. 126-4 and 126-5Buildings, rooms and evacuation routes requiring emergency lighting, and its structure.325CO0000000338
Water receiving tankBuilding Standards Act Enforcement Order, Art. 129-2-4 / Waterworks Act, Art. 34-2Structure of water supply and drainage piping, management of simplified dedicated waterworks and an annual periodic inspection. 1F outdoors, basement machine rooms, rooftops.325CO0000000338
332AC0000000177
Power receiving & transforming equipmentElectricity Business Act, Art. 42 (safety regulations), etc.Safety regulations for electric facilities for business use. Electrical rooms, rooftops, basements, etc. The first equipment to protect during flood warnings (KIKIKURU link).339AC0000000170

On screen, these are shown with article numbers as "reference guidelines based on regulations". They do not replace the judgment of the authorities.

NATIONAL BUILDING DB

The nationwide building DB and the base data for every building

6,772,689 buildingsTotal buildings in the nationwide building DBAs of November 14, 2026 (47 prefectures, 1,892 municipalities, 6,772,689 buildings)* Buildings across Japan change constantly through new construction and demolition. The figure above is the confirmed number of buildings extracted and verified by our spatial-reasoning engine from public open data (MLIT PLATEAU, GSI) and base map data as of November 14, 2026.
Data categoryCoverageUnitsBuildings
High-definition 3D city model areaTokyo's 23 wards, Kyoto City, Osaka City: 58 wards58859,179
Regional 3D city model area37 major municipalities in Kyushu and Okinawa37423,108
Wide-area 2D outline & elevation area1,797 municipalities and wards nationwide1,7975,490,402
TotalAll 47 prefectures1,8926,772,689

"Three-layer hybrid differential updates" that keep pace with daily construction and demolition

Daily

① Instant updates starting from the site

Even for newly built or extended buildings, the building's data is updated in real time the moment an address is entered or as-built drawings are loaded on site (Initial Setup Mode) or a walking verification is done with a smartphone (Smartphone Mode).

Monthly

② Differential patch updates of changed parts only

Instead of recalculating everything every month, we find and update only the blocks where map data shows new construction or demolition, keeping nationwide data current with minimal computing load.

Annual / semi-annual

③ Municipality-level updates for newly published PLATEAU cities

As MLIT PLATEAU publishes new cities or annual updates, we upgrade each municipality in turn from the "wide-area 2D area" to the "3D city model area".

Six kinds of base data included for every building from the start

TierContent (example: Nishijin Sangyo Sozo Kaikan)
① Identification IDPLATEAU's nationally unique building ID (26100-bldg-502331) or an ID based on map building shapes. A facility ID that does not change even if ownership or the management company changes.
② Name & locationBuilding name, prefecture and reference address (97 Kainokami-cho, Kamigyo-ku, Kyoto, Kyoto Prefecture).
③ Position & elevationLongitude and latitude of the representative point, and GSI elevation.
④ Floors & measured height3 floors above ground, 0 below ground, measured height 20.3 m.
⑤ Use, structure, year completedBusiness facility, reinforced concrete, 1921. The protection class (Standard, High, Classified) is selected automatically from the use and used for gate decisions (changeable with one tap).
⑥ Outline shape & front roadFour corners of the outline, frontage W 18.5 m, depth D 42.8 m, building orientation, front road (Nakadachiuri-dori).

In 3D city model areas, ① to ⑥ are all present. In wide-area 2D outline & elevation areas, the outline, position, elevation and road are present, and floors and structure are filled in through Initial Setup Mode input and outline confirmation.

A common data box that accumulates under each facility ID

Permission hierarchy

Owner_ID (owner), Portfolio_ID (group), Building_Master_ID (property), Sub_ID (management company, contractors). Even if the management company changes, drawings and records carry over intact.

3D model & floor plans

Outline area, rooftop portion and total floor area of each floor; rooms (name, area, corners, doors) and equipment positions.

Disaster & weather

KIKIKURU (inundation, flood, landslide), hourly precipitation, and markers on critical equipment that flash during heavy rain.

Records of the 7 practical functions

Patrol, inspection, emergency and repair history; before/after repair photos with GPS location proof; upcoming inspection dates; on-site walking records and drawing verification results.

RESEARCH

Preventing the "deterioration" of Japan's heart and things, restoring them and passing them on to the next generation

Founding story

A story set in Kyoto in 1866 that looks again at what the Japanese have left behind.

Mathematical papers

Deterioration prediction, marker-free floor plan estimation, pre/post-disaster differences, asset valuation and intergenerational connection — organized mathematically.

Patent portfolio

1 registered and 6 pending. Mechanisms for repair assessment, insurance premium calculation, asset valuation and more are protected as rights.

In systematizing its current spatial mathematical models and the social-asset integration platform Ichigen-Cho, DiO Inc. has accumulated basic research on spatial differential analysis, deterioration prediction and corporate valuation through joint research and academic guidance with the following universities and research institutions.

① Joint research on digitalizing disaster-damage certificates and spatial differential analysis (completed): through joint research with the Disaster Prevention Research Institute, Kyoto University and the Graduate School of Engineering, Kyoto University, we studied determining damage through temporal and spatial differential analysis of pre- and post-disaster 3D building data, and speeding up the issuance of disaster-damage certificates by local governments.

② Research on asset valuation models for facilities and plants combining 3D digital analysis and finance theory (completed): through interdisciplinary joint research with a research team in graduate management and information science — with the participation of Prof. Keiji Murakami (currently Professor [Distinguished Professor], Graduate School of Management, Kyoto University; President, Global Business Society), Prof. Emeritus Kiyoshi Kobayashi of Kyoto University (Specially Appointed Professor, Graduate School of Management) and Program-Specific Prof. Kazuya Aoki, among others — we studied asset valuation models that integrate partial deterioration prediction of structures and plants with corporate valuation in finance (M&A, banking and insurance practice).

③ Academic supervision and recommendation of the First Paper: we have received academic supervision and a recommendation for the First Paper (automatic inference of three-dimensional spatial structure in multi-story buildings using the slab area conservation law and Z-axis topological invariance) (see the First Paper box under "Academic foundation" above). The Second to Fourth Papers are not covered.

The above are past joint research and academic collaborations. The Ichigen-Cho series currently offered (22 categories in total: 12 public and 16 private, including 6 overlapping), the four foundational papers and the seven patents are intellectual property independently developed and systematized by DiO Inc. on the basis of the knowledge gained through this research.

PATENTS

DiO Inc. business model patents

Patents on business and service mechanisms, separate from technical mechanisms (7 in total including related applications). Titles are as stated in the official gazettes (shown in Japanese).

NumberApplication / publicationTitle
P24002JP Application 2024-042938 / JP Publication 2025-143617Repair assessment system, repair assessment program and repair assessment method for buildings such as high-rise buildings and high-rise condominiums
P24003JP Application 2024-107812 / JP Publication 2026-007716Insurance premium calculation system, insurance premium calculation program and insurance premium calculation method for buildings
P25001JP Application 2025-010987 (pending)Plant evaluation system, plant evaluation program and plant evaluation method
P25008JP Application 2025-196349 (pending)Asset valuation system, asset valuation program and asset valuation method